Just look

Lp-canexel-siding-installation-instructions, installation instructions lp® canexel® ced’r-vue prefinished lap siding storage do not store canexel siding in heated buildings. storage in heated buildings will dry out the siding and make it susceptible to buckling. the siding must be kept on lp canada supplied pallets so that it remains flat, and must be covered with a water resistant shroud. Trim trim should be thick enough so the siding does not extend beyond the face of the trim. trim and fascia must be applied in a manner that will not allow should be spaced 12 in. o.c. (300mm) and securely nailed into the, ridgewood d-5™/ultra plank™ pre-finished lap siding limited warranties finish: 15 years board: 25 years installation instructions may 2005 important read carefully before starting installation. coverage: 1,000 sq. ft. of wall surface requires approximately 1,100 sq. ft. of siding (does not include cutting waste). a) introduction.

Lp canexel prefinished lap siding features expertly crafted colours and a signature wood-grain texture for unrivaled beauty.